13 April 2027
Stream

Welcome Remarks and Data Deep-Dive

Tom Duffell
Head of Proximo Product (Americas),
Exile Group

Join the Exile team for a review of the data behind the deals, touching on:

  • The growth in hyperscale volume
  • Campus-scale tickets
  • Repeat sponsors and how power is pricing deals
Stream

Keynote

Josh Pang
Head of Digital Infrastructure AIF,
Apollo
Stream

The US Digital Stack: Demand, Hyperscalers, and Where Capital is Going

Kanan Joshi
Partner, Co-Head North America, Head of Digital Infrastructure,
CVC DIF

Hyperscaler/AI demand is the story everyone can recite. The bigger debate is whether leases, delivery dates and termination blow up the capital stack. Rent is set by who signs, not by rates — and the paper matters as much as the tenant. This panel will discuss:

• Who is actually contracting US digital capacity and at what tenor?

• Where capital is going first: power-ready sites, fiber, or GPU clusters?

• If a campus gets built late, with cost overruns, can the financing structure survive?

Stream

Power: The Constraint That Prices Every Deal

AI campuses are no longer a real-estate story with a utility bill attached. Rather, power has become the gatekeeper for project viability with capital following megawatts that are contracted and deliverable. This panel will delve into the power dynamics that determine whether a financing can launch:

• When there are interconnection queues and delays in delivery of power to the grid, who eats the delay?

• Behind-the-meter / co-located gas, renewables, storage, nuclear. What is financeable now?

• PPA vs utility vs merchant residual — curtailment, basis and shape risk

• Power + data centers as one financed asset

Stream

Fiber, Front and Center

Joshua Oboler
Investment Partner,
Palistar Capital

Compute with no path to the network is not a campus lenders will finance. Long-distance, city and last-mile fiber is now its own asset class. This panel looks at unused capacity versus operated service, contracted routes, construction and land access, and how fiber sits next to campuses, asking:

• When is cash flow contracted, and when is the risk still construction?

• Where do large-buyer routes and campus laterals overlap with data-center sites, and how do campus-to-city and city-to-undersea links sit together?

• When is fiber a standalone credit, and when will lenders only hold it because it is tied to a campus?

Stream

Financing Bankable Structures in a Barbell-Shaped Market

Tim McGuire
Vice President, Capital Markets,
Rowan Digital Infrastructure
Jiri Honajzer
Vice President | Infrastructure Investments,
Brookfield

Banks still go hard at investment-grade, hyperscaler-linked, heavy-asset paper at scale and with tight pricing. At the other end, growth prospects often look and price like equity. The middle — structured, mid-market, bespoke — is thin and still being built. This panel will consider:

• How to finance non-investment grade, complex digital infra (the hard end of the barbell)

• What are the structures, wrappers, and real demand underwriting?

• Public vs private capital, and club financing

Stream

Financing GPUs: Huge Contracts, or Something Else?

Lenders and lessors are putting large sums against AI hardware, but the loans often last longer than a chip generation stays competitive. The question is, what actually supports repayment if demand, prices, or chip generations move against you? This panel will discuss:

• Is the credit the contract, the chip residual, or the sponsor?

• Who eats obsolescence — the borrower, the financier, or the manufacturer?

• What can actually be borrowed against, and what stays as an owned asset on the company balance sheet?

Stream

Private Credit and Institutional Takeouts

Tiara Tingle
Vice President,
DigitalBridge
Margaret Osmulski
Principal,
Ares Management
Wes Altman
Managing Director, Infrastructure Credit & Structured Equity,
BlackRock GIP

With banks less willing to sit on construction risk, private lenders have stepped into the middle layer of the capital stack. In this session, speakers will have a practical conversation about who fills the gaps, on what terms, and what has to be true for a takeout to work, looking at:

• How money is raised and then refinanced: loans that sit at the company versus at the project-level

• Notes and packaged loan sales of the kind seen on large data-center refinancings

• Construction finance that is meant to become long-term debt, and whether the exit is a takeout into new buyers or simply the same lenders staying on

Stream

Data centers: Planning, Politics and Who Gets Paid

Polls show most Americans do not want large AI campuses next door, mainly due to concerns about water, power, noise and strained local services. But if a developer loses local consent, a site can freeze overnight — which is a credit event, not a communications problem.

For lenders, where you build and whether the town will let you finish now weighs as heavily as the customer contract. This panel will touch on:

• Which states and counties still clear large campuses, and which ones strand equity and construction loans?

• How lenders price a potential community veto into project planning• Why site choice is just as important as the customer contract, since a strong tenant does not save a site that cannot get zoning, water or grid access

• Who carries the cost if a campus is ready on paper but not allowed to switch on

Stream

Insuring US Digital Infrastructure: Delay, Power, and Paper That Actually Pays

Hyperscaler demand is priced in. What isn’t is whether the insurance tower still stands if the campus is late, the substation slips, or the tenant’s paper is thinner than the headline name. This panel will discuss:

• What is actually insurable on a US digital campus today — delay in start-up, grid/interconnect, construction all-risk, cyber, and political/regulatory — and what underwriters are carving out when the off-taker is a hyperscaler vs a reseller.

• Who the real insured interest is — landlord, holdco, construction lender, or the lease — and whether termination, delayed delivery, or a change in tenant credit blows the placement.

• If the campus overruns or energizes late, does the insurance structure recapitalize the deal — or just document a loss the capital stack already knew was coming?

Stream

US Data Centers: What Comes After the Build Cycle?

Everyone can recite hyperscaler demand. The harder question is whether the next wave of campuses still clears — on land, in town halls, and on AI returns that have not shown up in the model yet. This panel will discuss:

• Where innovation actually sits — power, cooling, modular build, and interconnect — versus more of the same megacampus, and what that does to delivery risk

• Real estate and the neighbors — site scarcity, water and grid fights, community opposition, and whether the next US cluster still gets entitled on the timeline the lease assumes

• AI ROI vs the rent roll — if utilization, token economics, or tenant credit wobble, does the campus still underwrite, or does the market reprice “must-build” as optional?